Modernising local infrastructure at the PC universities.
In accordance with the project work plan, the infrastructure was modernized at all partner universities aimed at introducing modern ITC technologies into the training of engineers in CMS areas. At the preliminary stage of the project, the needs of each partner university were determined for ITC equipment necessary for the effective implementation of the InMotion project. Based on the analysis of the required equipment, a hardware and software procurement plan was drawn up.
Modernising local infrastructure at the PC universities